Step 1:  Initial Consult

We’ll arrange a time that best suits your schedule, even for evenings and weekends, and we’ll come by your house, measure the custom cabinets  you’d like, and email you a quote a few days later.

Step 2: Initial Rendering – 20/20 Design

We use the advanced 20-20 3D designing software for creating our designs. The dynamic functionality of 20-20 Design guides our customers through the design process, clearly communicating design ideas in floor-plan or elevation views with 2D/3D shapes, and transforming customer wish-lists into reality.  We provide the initial rendering of your Modern kitchen showroom with free of cost.  

Step 3: Initial deposit and Final Renderings

When you are ready to proceed and finalize on the design with changes if any, a final rendering with all the additional changes will be created and approved.  We have good selection of wood, doo styles, stains/ colors, crown mouldings, granite,Corbels and other accessories to choose from.  Our knowledgeable staff will help you narrow the choice.   

Step 4: Final measure and Templating

As one of the most critical steps in the entire process, we have invested significant capital in purchasing the most advanced laser templating hardware available.  Our trained Templator will come to your home shortly after your order has been confirmed to template and measure your Cabinet Wood Species and countertops.

This process will take approximately 90 minutes to complete. It’s then turned into an AutoCAD drawing and ready for fabrication

Step 5: AutoCAD and Fabrication

Once we have the Laser Templating files, our Drafting personal will generate a custom AutoCAD drawing for your job.  The final 20/20 designs  and AutoCAD  drawings are then downloaded to the factory floor, and is ready for fabrication.

With over 1000 years of combined experience in the cabinet and granite business, our factory takes pride in delivering the highest quality Marble and granite countertops ,Cabinets and Granite Countertops in the industry.

Step 7: Tear Out and Plumbing Services

As part of the process, your old cabinets and countertops will need to be removed and disposed of. As part of the removal and installation process, your current sinks will need to be disconnected and your new sinks will need to be reconnected approximately 24 hours after your installation.

We offer these services through Independent Contractors who work according to our schedule, reducing the confusion which can occur when trying to schedule multiple trades for a single job.  Your Sales person can help you to decide which services are right for you and include them on your invoice.

Step8: Installation
Once we have received your completed job, we will contact you and schedule an installation date.

If you have gone through Granite Direct to supply your Tear Out and Plumbing services, we will coordinate these trades to show up and perform these services at the same time. If you have arranged these services independently, you will need to ensure that the site is prepared prior to our installation crews arriving.

Step 9: Quality Control Visit
Once the project is finished our Quality Controller visits your house to make sure we met and exceeded your expectations.  If you have issues, we will resolve them.

At Granite Direct we want to win your referral!  We won’t rest until you answer yes to the question: Would you refer Granite Direct?

Please fill out the form below for more information about Granite Direct, or if you would like to talk to a sales representative.

create your own Kitchen

Get a Free Estimate

Why choose us